Grading and compaction of base material are currently in progress as part of the preparations for casting reinforced concrete for the roadway construction.
This phase of the Orange Hill project involves the paving of two streets:
• Street 8 – 150m in length
• Street 9 – 150m in length
Both streets will feature a 5m-wide reinforced concrete roadway, complemented by a curb and slipper drainage system.
This work is part of the Kuwait Dynamics Limited (KDL).